Summary
Overview
Work History
Education
Skills
Furthertraining
Languages
Computercompetence
Majorstandardexperience
Laboractivity
Passportdetails
Contacttelephonenumber
Registrationaddress
Personal Information
Certification
Timeline
Generic
EDUARD MIRAMETOV

EDUARD MIRAMETOV

Tashkent

Summary

Solutions-oriented engineering professional with strong understanding of product development process. Brings excellent interpersonal and communication skills to work effectively with colleagues, management and vendors. Proactive in identifying areas of improvement and taking steps to drive successful completion of projects. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Qualified Mechanical Engineer with extensive knowledge of engineering equipment and software. Committed to providing accurate work with eye for detail. Consistently commended for meeting stringent project deadlines under budget. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Mechanical engineer position. Ready to help team achieve company goals.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Lead Mechanical Engineer

Bukhara Refinery Modernization Project
04.2024
  • Preparation of scope of work, participation in meetings, verification of design documentation, review of vendor documentation

Mechanical Manager Commissioning Directorate

Enter Engineering PTE.LTD
09.2023 - 04.2024
  • Participation in commissioning activities, scheduling of work, control of commissioning execution
  • Managed cross-functional teams for successful project completions, ensuring timely delivery and client satisfaction.
  • Improved inventory management systems by tracking usage patterns and adjusting ordering schedules as needed.
  • Evaluated employee performance through regular reviews providing constructive feedback for individual growth and overall team success.
  • Conducted root cause analysis for recurring issues, resolving underlying problems and preventing future occurrences.
  • Evaluated vendor proposals, selecting high-quality products at competitive prices to support business objectives.
  • Assisted in budget preparation and monitoring expenses closely to stay within established limits without compromising quality or deadlines.
  • Developed innovative solutions to complex mechanical problems, improving overall system performance.
  • Reviewed technical drawings and specifications to ensure accuracy, minimizing errors during production stages.
  • Analyzed existing structures to create plans for modifications and improvements.
  • Evaluated existing procedures and made proactive adjustments to meet changing demands.

Lead Mechanical Rotating Equipment Engineer of the Design Department GPP and Technological System

FC 'Surhan Gas Chemical Operating Company'
10.2019 - 10.2023
  • Reviewing project documentations, participation in meetings, reviewing vendor documentation
  • Planned [Number] [Type] projects from beginning to end, focusing on timelines, budgets and mechanical feasibility.

Lead Mechanical Engineer Commissioning Directorate

Enter Engineering PTE.LTD
03.2023 - 12.2023
  • Participation in commissioning activities, scheduling of work, responsible for planning commissioning works
  • Planned four oil and gas, and mining projects from beginning to end, focusing on timelines, budgets and mechanical feasibility.

Chief Mechanical Engineer of the Ethylene plant

The JV Uz-Kor Gas Chemical LLC
06.2014 - 04.2019
  • Technical acceptance of completed construction and installation works, scheduling of work, responsible for planning maintenance works

Machinist of 3rd grade of Ethylene plant

JSC 'Uzberkneftgaz qazibchiqarish' Sho'rtan Gas Chemical Complex
11.2013 - 06.2014
  • Operation and maintenance of equipment

Education

Bachelor of Science - Mechanical Engineering

Tashkent Chemical-technological Institute
Tashkent, Uzbekistan
09.2013

Skills

  • Participation in various phases of oil and gas refineries and gas chemical plants such as design, construction, pre-commissioning, commissioning, start-up, operation and overhaul
  • Knowledge of project implementation phases in oil and gas refineries and gas chemical plants
  • Knowledge of development and review of basic design stage documentation, FEED stage and detailed design documentation
  • Knowledge of developing and reviewing of material requisitions and verifying correctness of technical evaluation reports
  • Knowledge of developing project requirements and specifications for all types of mechanical equipment
  • Knowledge of consistency checking of Supplier documentation for compliance with project requirements, local and international standards
  • Participation in factory testing and acceptance at vendor shop of dynamic equipment such as compressors and pumps of different types, steam turbines and oil systems of dynamic equipment
  • Checking and decision-making on technical deviations and technical requests
  • Participation in meetings such as HAZOP, P&ID and 3D (30%, 60% and 90%)
  • Reliability Engineering
  • Engineering standards
  • Microsoft Excel
  • Maintenance Planning
  • Staff Management
  • Mentoring and training
  • Scheduling
  • Quality Assurance
  • Project Management
  • Troubleshooting
  • On-site inspections
  • Mechanical engineering knowledge
  • Technical direction and product strategies
  • Maintenance manual development
  • Complex problem solver
  • Technical Documentation
  • Design reviews
  • Test procedures
  • Quality Assurance Controls
  • Technical Writing
  • American Society of Mechanical Engineers (ASME)
  • Feasibility review
  • Pressure vessel design knowledge
  • Metallurgy
  • Critical Thinking
  • Decision-Making
  • Mechanical Designs
  • Materials Planning

Furthertraining

  • Daesan Plant, Key man training for Uz-Kor Gas Chemical Complex, Korea Republic
  • DongYang Chemical Pumps, Training about technology of manufacture and testing of centrifugal pumps, Korea Republic
  • Flowserve KSM, Training about technology of manufacture and testing of mechanical seals for Rotating Equipment, Korea Republic
  • Elliott Corporation Group, Training about operation and maintenance of back pressure steam turbines of the Elliott Company, Switzerland
  • Siemens Germany, Training of operation, maintenance and repair of centrifugal compressors and steam turbines, Uzbekistan Republic, UGCC plant
  • Syndyne France, Training of operation and maintenance of the centrifugal compressors at the Syndyne Vendor shop. Participation on Factory acceptance test and acceptance of the equipment after testing., France, Dijon
  • Airpack Nederland B.V., Training of operation and maintenance of the air screw compressors at the Airpack Nederland B.V. Vendor shop. Participation on Factory acceptance test and acceptance of the equipment after testing, Netherlands, Zierikzee

Languages

Russian
English
Uzbek
Kazakh
Karakalpak

Computercompetence

MS office (Word, Excel, Ppoint, Front Page, Visio, Project), AutoCad, Naviswork and etc., experienced user

Majorstandardexperience

  • API 610 11th Edition Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas Industries
  • API 611 General-purpose Steam Turbines for Petroleum, Chemical, and Gas Industry Services
  • API 612 Petroleum, Petrochemical, and Natural Gas Industries-Steam Turbines - Special-purpose Applications
  • API 614 Lubrication, Shaft-sealing and Oil-control Systems and Auxiliaries
  • API 617 Axial and Centrifugal Compressors and Expander-compressors
  • API 618 Reciprocating Compressors for Petroleum, Chemical, and Gas Industry Services
  • API 619 Rotary-type Positive Displacement Compressors for Petroleum, Petrochemical and Natural Gas Industries
  • API 671 Special Purpose Couplings for Petroleum, Chemical and Gas Industry Services
  • API 672 Packaged, Integrally Geared Centrifugal Air Compressors for Petroleum, Chemical, and Gas Industry Services
  • API 673 Centrifugal Fans for Petroleum, Chemical, and Gas Industry Services
  • API 674 Positive Displacement Pumps-Reciprocating
  • API 675 Positive Displacement Pumps- Controlled Volume for Petroleum, Chemical, and Gas Industry Services
  • API 676 Positive Displacement Pumps-Rotary
  • API 682 Pumps-Shaft Sealing Systems for Centrifugal and Rotary Pumps
  • ISO 5199 General Purpose Centrifugal Pumps
  • NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection
  • ASME Section VIII Devision I and II- Pressure Vessel and Boiler
  • API Specification 5L - Specification for Line Pipe
  • ASME B16.5 - Pipe flange & flanged fittings
  • ASME B16.47 - Large diameter steel flange
  • API Specification 6D - Specification for Pipeline and Piping Valves

Laboractivity

  • 04/24/2024, present, Bukhara Refinery Modernization Project, Lead Mechanical Engineer, Oil Refinery Plant, Preparation the scope of work for the Basic design stage for mechanical discipline for Licensor AXENS France., Preparation the delivery scope of documentations for the Basic design stage for mechanical discipline for the Bukhara Refinery Modernization Project., Participation with AXENS on kick-off meeting for signing the contract., Preparation the scope of work for FEED Contractor for mechanical discipline for Chine Petroleum Engineering Construction Company (CPECC)., Preparation the delivery scope of documentation for FEED stage for mechanical discipline for the Bukhara Refinery Modernization Project., Participation on kick-off meeting and clarification meetings with FEED Contractor CPECC., Verification of the correctness of the design documentation developed by the AXENS Licensor., Checking for consistency with local and international codes and standards of design documents for the Basic Design stage such as Basic Engineering Design Guidelines, Material Selection Guidelines, PFD, H&MB, Material Selection Diagram, Process data sheets, Long lead items Manufacturer and Equipment List., Check the consistency and compliance with local and international standards of the engineering documents developed by the CPECC contractor for FEED stage such as Basic Engineering Design Guidelines, Engineering Specifications for Mechanical Equipment, Mechanical data sheets for mechanical equipment, Material Requisitions for mechanical equipment, Material Selection Guidelines, Material Selection Diagrams, Technical Evaluation Reports for Mechanical Equipment, etc., Review vendor documentation according to project requirements., Participate in meetings such as HAZOP, 3D Review meeting, RAM Study (reliability, availability and maintainability analysis) etc., Verifying the correctness of the technical bid evaluation report in accordance with the requisitions for inquiry and procurement and project documentation, checking compliance and adherence to local and international norms and standards.
  • 12/09/2023, 04/23/2024, Enter Engineering PTE.LTD, Mechanical Manager Commissioning Directorate, Engineering, Procurement, Construction, Pre-commissioning, Commissioning and Start-up, Participation in the commissioning activities where projects has delay and solving the occurred problems timely., Scheduling of work - the compilation and monitoring of inspection schedules for mechanical equipment for timely scheduled work., Control of commissioning execution in time., Control and manage the mechanical team of commissioning directorate in all projects of Uzbekistan., Prepare yearly plan for mechanical discipline of commissioning directorate., Checking and approving of spare parts, consumables and special tools for purchasing.
  • 03/10/2023, 12/08/2023, Enter Engineering PTE.LTD, Lead Mechanical Engineer Commissioning Directorate, Engineering, Procurement, Construction, Pre-commissioning, Commissioning and Start-up, Participation in the commissioning activities where projects has delay and solving the occurred problems timely., Scheduling of work - the compilation and monitoring of inspection schedules for mechanical equipment for timely scheduled work., Preparing applications for ordering spare parts and special tools required for pre-commissioning and commissioning activity., Responsible for planning the commissioning works mechanical equipment., Responsible for controlling the schedule of commissioning activities for all projects in Uzbekistan., Technical supervision of the implementation of the schedule commissioning and maintenance work., Implementation of maintenance works and operation of mechanical equipment.
  • 09/10/2019, 03/10/2023, FC Surhan Gas Chemical Operating Company, Lead Mechanical Rotating Equipment Engineer of the Design Department GPP and Technological System, Gas Processing Plant, Reviewing the correctness of project documentations, consistency checking and compliance with local and international codes and standards of the project documents, which are developed by Licensor Shell for Basic design stage, such as Basic Design Guidelines, Material Selection Guidelines, PFD, H&MB, Material Selection Diagrams, Process data sheets, Mechanical data sheets and etc., Reviewing the correctness of project documentations, consistency checking and compliance with local and international standards of the project documents, which are developed by FEED Subcontractor WOOD for FEED stage, such as Basic Engineering Design Guidelines, Process descriptions, PFD, P&ID, H&MB, Material Selection Guidelines, Material Selection Diagrams, Process Data Sheets, Mechanical Data Sheets, Material Requisitions, Technical Bid Evaluations for Rotating Equipment and etc., Reviewing the Vendor documentation according to Project requirements., Participation on the meetings, such as HAZOP and SIL Review meeting, PFD Review meeting, P&ID Review meeting, 3D Review meeting, RAM Study analysis meeting and etc., Reviewing the correctness of Material Requisitions for Enquiry and for Purchase, consistency checking and compliance with local and international codes and standards., Reviewing the correctness of Technical Bid Evaluation Report according to Material Requisition for Enquiry and Purchase, also with project documentations, consistency checking and compliance with local and international codes and standards., Reviewing the correctness of project documentations, consistency checking and compliance with local and international standards with project documents, which are developed by Detail Design Subcontractor UZLITI Engineering for Detail Design stage., Participation on Kick-off meetings with FEED Subcontractor, Detail Design Subcontractor and with Vendors.
  • 06/23/2014, 09/04/2019, The JV Uz-Kor Gas Chemical LLC, Chief Mechanical Engineer of the Ethylene plant, Gas Chemical Plant, Technical acceptance of completed construction and installation works and facilities, preparation of the necessary technical documentation. Participation in the commissions for the acceptance of construction projects and their commissioning., Scheduling of work - the compilation and monitoring of inspection schedules for rotating and stationary equipment for timely scheduled work., Preparing applications for ordering spare parts required for planned and unplanned maintenance of rotating and stationary equipment., Responsible for planning the maintenance works as per Vendor recommendation and as per local rules for Rotating equipment., Singly responsible for timely and safety carry out of planned Turn Around (TA) for all Rotating and Static equipment of Ethylene plant, such as Pyrolysis gas compressor (Siemens), Propane and Ethylene refrigerant compressors (Siemens), Steam turbines (Siemens), Steam turbines (Elliot), Centrifugal pumps (Dongyang, Yongpong, Ebara, Roto-jet), Cryogenic pumps, ID Fans (Howden), screw, reciprocating and chemical injection pumps, Pyrolysis Furnaces, Columns, Reactors, tube and shell heat exchangers, plate type heat exchanger, mesh and cartridge filters and etc., Responsible for drawing-up the acts for carried out maintenance works after completation., Responsible to organize the daily, monthly and yearly control the rotating equipment by site mechanics., Responsible for timely making requisition for purchase of spare parts for all above mentioned equipment, The introduction of correspondence with KBR Licensor and the GS E&C General Contractor on resolving acute problematic issues regarding the rhythmic and stable operation of the ethylene plant and UGCC as a whole., Control of project documentation, technical regulations and passports of technological equipment., Technical supervision of the implementation of the schedule of construction, installation, commissioning and maintenance work., Implementation of maintenance works and operation of stationary and rotating equipment., Preparation of documentation for approval of the replacement of selected materials with supplier as necessary, preparation of material requisition for spare parts.
  • 11/22/2013, 06/13/2014, JSC Uzberkneftgaz qazibchiqarish, Machinist of 3rd grade of Ethylene plant, Production of granules of polyethylene and polypropylene, liquefied gas, pyrolysis distillate and pyrolysis oil, Learning of technological documentation, technical passports of equipment and regulations. Compose of technical acts of hand over to repair and receive from repair of equipment., Filling of shift logs and monitoring the correct and safe operation of technological equipment., Start-up and stop, maintenance of all types of stationary and rotating equipment., Responsible for preparation of rotating equipment for maintenance., Responsible for carry out planned and unplanned maintenance of rotating equipment., Responsible for daily, monthly and yearly control of rotating equipment

Passportdetails

АD 2706753, 02/03/2023, 01/03/2033, FA 0005764, 02/05/2019, 01/05/2029

Contacttelephonenumber

+998975608999

Registrationaddress

Sayram-4 street, Tashkent, Mirzoulugbek region

Personal Information

  • Place of Birth: Karaozek region
  • Citizenship: Uzbekistan
  • Number of Children: 3
  • Date of Birth: 03/06/1989
  • Nationality: Karakalpak
  • Marital Status: married

Certification

  • Centrifugal pumps manufacturing, Dong Yang Chemical pumps - 2018
  • Steam Turbine maintenance, Elliott Corporation Group - 2019
  • Operation and maintenance of air screw compressors, Airpack Netherland B.V. - 2023

Timeline

Lead Mechanical Engineer

Bukhara Refinery Modernization Project
04.2024

Mechanical Manager Commissioning Directorate

Enter Engineering PTE.LTD
09.2023 - 04.2024

Lead Mechanical Engineer Commissioning Directorate

Enter Engineering PTE.LTD
03.2023 - 12.2023

Lead Mechanical Rotating Equipment Engineer of the Design Department GPP and Technological System

FC 'Surhan Gas Chemical Operating Company'
10.2019 - 10.2023

Chief Mechanical Engineer of the Ethylene plant

The JV Uz-Kor Gas Chemical LLC
06.2014 - 04.2019

Machinist of 3rd grade of Ethylene plant

JSC 'Uzberkneftgaz qazibchiqarish' Sho'rtan Gas Chemical Complex
11.2013 - 06.2014

Bachelor of Science - Mechanical Engineering

Tashkent Chemical-technological Institute
  • Centrifugal pumps manufacturing, Dong Yang Chemical pumps - 2018
  • Steam Turbine maintenance, Elliott Corporation Group - 2019
  • Operation and maintenance of air screw compressors, Airpack Netherland B.V. - 2023
EDUARD MIRAMETOV